Facility
  • Dedicated Production Blocks with access control
  • All Washing/Sterile Areas have Joint-less Epoxy flooring
  • Filling/Sealing carried out under Class 100 Area surrounded by Class 1000 Area
  • 2 Independent Hot Loop systems for Purified Water and Water for Injection. All piping of SS 316-L. PLC Based Monitoring and Control for critical parameters.
  • Dedicated AHU’s for all areas. Complete Facility has 100% Power back up
  • UPS connection for all critical equipment like HVAC’s, inspection machines, stability chambers, etc.
  • Man Entry for core areas through secondary change facility.
  • Material Entry through Dynamic Pass Boxes
  • BMS for all critical areas in the plant