Facility
- Dedicated Production Blocks with access control
- All Washing/Sterile Areas have Joint-less Epoxy flooring
- Filling/Sealing carried out under Class 100 Area surrounded by Class 1000 Area
- 2 Independent Hot Loop systems for Purified Water and Water for Injection. All piping of SS 316-L. PLC Based Monitoring and Control for critical parameters.
- Dedicated AHU’s for all areas. Complete Facility has 100% Power back up
- UPS connection for all critical equipment like HVAC’s, inspection machines, stability chambers, etc.
- Man Entry for core areas through secondary change facility.
- Material Entry through Dynamic Pass Boxes
- BMS for all critical areas in the plant